The Silver Street Bridge in Ashland, Nebraska needed major repairs. The existing steel-truss bridge...
Fuller, Mossbarger, Scott and May Engineers, Inc. (FMSM) needed a subconsultant to conduct field surveys...
The Nebraska Public Power District (NPPD) wanted to enhance service reliability across the state...
Lexington, Nebraska was growing. The city needed to plan for a rapidly growing population...
The City of Council Bluffs is provided flood risk reduction protection by an integrated levee system made up of many components...
Battle Creek is a small community with a 2.5 MW peak demand and 10.5 mwh annual consumption...
Police officers in Council Bluffs, Iowa, needed a new headquarters. Their previous headquarters was on its last legs...
The intersection at 14th and Old Cheney in South Lincoln is one of the busiest in the city, and cannot...
Broken Bow, Nebraska knew their library needed a renovation. The renovation idea had been on their planning...
Hickman, Nebraska wanted a community space. They wanted to enjoy the learning opportunities provided by a library...
Aurora’s city pool was 45 years old. It could barely accommodate more than 200 people...
2012 brought one of the most severe regional droughts to Nebraska. Citizens, particularly farmers, struggled to meet...

The Challenge: 
Severe weather, like flooding and tornadoes, have...

Our Water Infrastructure team completed a preliminary engineering report (study), which revealed that the solids contact unit (SCU) basin mechanism was in poor condition and essentially inoperable.
Text Color
#414141